Saturday, February 1, 2014

Fresh Sewing Day February 2014

I didn't get too much fully completed in January but I got a lot of things to the point of almost done. :) I have several quilt tops that just need the blocks sewn together. I also have a quilt top that is ready to be quilted, the back just needs to be completed. I also started the Minneapolis Modern Quilt Guild Mystery Quilt Along. And as always I did some bee blocks.

Knee Socks in ProgressSolid Rectangles in ProgressTarget Quilt Top FinishedHand Pieced Quilt Along BastedMinneapolis MQG Mystery Quilt Along Step 1 January 2014Harmony. do. good. stitches. - January 2014 Block 1


I will do a full post on the Target quilt above, but I just finished the top and want to get some more up close pictures for that post before you see it!

Thanks for joining and Happy Fresh Sewing Day!

Lily's Quilts


Colby

7 comments:

  1. I am in love with that first quilt! Hoping to see more....

    ReplyDelete
  2. This comment has been removed by a blog administrator.

    ReplyDelete
  3. Your quilts are beautiful, it was a pleasure to pop in from lily's quilts.

    Peg x

    ReplyDelete
  4. Great quilts! I did the same thing this month, worked on a lot of different projects, but didn't finish any. Have a wonderful February!

    ReplyDelete
  5. Fabulous work this month! I really love the sampler quilt, great use of fabric there :D

    ReplyDelete
  6. Wow so busy! I totally love the Framers Wife (?) quilt! Gorgeous!

    ReplyDelete
  7. I totally love the first quilt!! It is going to look amazing finished.

    ReplyDelete

Related Posts Plugin for WordPress, Blogger...